Hampton WWTP Upgrade Phase II
Town: Hampton
Bid Type: Construction
Posted: June 13, 2025
Due: June 11, 2025
Status: Open
The Town of Hampton is requesting sealed bids by qualified contractors to complete the Wastewater Treatment Plant Phase II upgrades. A comprehensive solids handling upgrade (rotary drum thickener, polymer system, thickened sludge transfer pump, sludge conveyor, sludge storage blowers and diffusers, and thickened sludge tank piping modifications), a septage receiving upgrades, a new grit dumping station, WAS/RAS pump upgrades, thickened primary sludge pump and grinder upgrades, sludge valve pit upgrades, influent wet well improvements, and rehabilitation of primary clarifier no. 2 and gravity thickener no. 2 . In addition, there will be plant water piping replacement, site piping replacement, SCADA and Instrumentation upgrades, and structural, architectural, and electrical upgrades to the affected buildings/structures.